From: route@monster.com
Sent: Thursday, April 07, 2016 11:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
JORGE NAVARRETE 3403 Abbott Way SW, Edmonton, AB, T6W 0X3. Email: navarrete72@gmail.com Tel: H- (780) 328
4248; M- (780) 938 2940 Languages: Spanish, English, FrenchCitizenship:
Canadian. Legend:
GMP-Good Manufacturing practices; SOP-Standard Operation Protocols; BOM- Bill
of Materials; CIP-Clean in Place; SIP- Sterilization in Place;
PLC-Programmable logic controller, SAP-Data management software, Power
Engineer. Keywords:
project, maintenance, manager, supervisor, management, engineer, design,
Microsoft Projects. Certifications: H2S alive (2010), TDG (2010), OSSA (2012, Keyano), PST/CSTS (2012,
Keyano). “Course (Date issued)” CAREER
PROFILE______________________________________________________ Leadership · Over ten
years of management experience. · Worked in
high paced/multicultural work environments. · Proficiency
on organizing priorities to meet aggressive deadlines of multiple projects. · Able to
negotiate internal and external projects details and scheduling conflicts. Project Management · Participated
in technological transfer, plant design, revamping of equipment and other
projects to improve the production capacity. · Technological
transfer and project design and execution experience. · Application
of the validation protocols (IQ, OQ, PQ) in the new facilities products of
the technological transfers and revamping. · Experience
in Scaling Up of processes. · Sound
Knowledge of performance of pressurized vessels, industrial equipment and
valves. ACHIEVEMENTS_______________________________________________________ · Participated
in a Technological Transfer, which result in a venture with China and the
design of a new plant (Biotech pharmaceutical Ltd, Beijing) for the
production of 15 kg/year of Mabs. · Plant
Design. Capacity expansion of CIM´s facilities from 5 to 15 Kg/year for hR3
and from 0,4 to 6 million bulbs/year for EPO. · Modification
in the software for the CHEMAP CPS fermenters resulting in an improvement of
its operation. · Developed
database in Access to track all spare part needed to improve maintenance
schedules. PROFESIONAL
EXPERIENCE___________________________________________ Maintenance Scheduler 2013 -
Current TransAlta. Keephills Power Plants, Alberta. · Prioritize
and schedule all maintenance work. • Create and plan maintenance work orders. · Coordinate
forced outage orders execution including all necessary work permits. · Develop
and modify Preventative Maintenance plans, PM, for the plant equipment. · Create
equipment data, functional locations, and Material's Bills-of-Materials
(BOMs) in SAP. · Estimate
cost, duration and resources for job/projects, coordinate contractor work. · Schedule
capital projects using Primavera P6, including FO and turnarounds. · Facilitate
routine daily, weekly, and forced outage meetings. · Analysis
of schedule variance, KPI trends, and critical paths. Plant Maintenance Specialist 2012 -
2013 Utopia Inc. Fort McMurray, Alberta. · Review
equipment data to determine relevant assemblies, sub-assemblies and spare
parts. · Equipment
validation, gather data from specified FLOCs or Equipment, of all the plants. · Populate
new SAP data base with equipment and material information. · Recommend
PM and part/equipment to place in stock. · Create
Material’s Bills-of-Materials (BOMs). · SAP master
data review, update and clean-up; work with JDE and Livelink. Production Supervisor 2011 -
2012 Lucerne Ice Cream Plant, Edmonton, Canada. Safeway Inc. · Production
planning, staff scheduling and performance appraisal. · Supervise
production and warehouse activities; shipping and receiving. · Analyse/create
cost performance data, and production reports. · Coach and
lead work teams towards a quality and safe work environment. · Monitor
change over times, and activities to achieve KPI values and company due
dates. Process technologist (Contract) 2010
- 2011 AFDP (UofA) Edmonton, Canada www.afdp.ualberta.ca · Set up and
start-up of the new fermentation and purification areas. · Work with
fermenters, separators, process tanks and related manufacturing equipment. Production Supervisor 2008 - 2009 QSVBiologics Edmonton, Canada (Company declared bankruptcy) · Working in
several projects in parallel, discerning priorities of work. · Interact
with clients; project updates, expectations, improve relationship. · Write SOP,
and other quality control documentation. Prepare work schedules · Provide
solutions to technical issues. Evaluate efficiency of processes. · Projects
planning, schedule, BOM, and due dates. · Staff
appraisal reviews, and recruitment of new personnel. Manufacturing Technologist III (Team Leader) 2007 - 2008 QSVBiologics Edmonton, Canada www.qsvbiologics.com · Maintain
project schedule and monitor team productivity. · Perform
calibration, maintenance, and validation of all equipment in the
manufacturing department.(reactors, homogenizers, centrifuges, and laboratory
equipment) · Provide
support in troubleshooting manufacturing equipment. Plant Maintenance Manager (Engineering Manager) 2002 -
2006 Center of Molecular Immunology (CIM) Havana, Cuba www.cim.sld.cu · Planning
of plant maintenance activities and control of maintenance budget · Planning
and coordination of employee work assignments (12 employees) · Searching
and commercial understanding with spare parts providers. · Experience
in process simulation, process flow diagrams (PFDs), process and
instrumentation diagrams (P&IDs), AutoCAD, energy and material balances. · Participated
in technological transfer, plant design, revamping of bioreactors and other
projects to improve the production capacity. Biotechnical Process Supervisor1997 -
2001 Center of Molecular Immunology (CIM) Havana, Cuba www.cim.sld.cu · Supervise
the plant operations (Up Stream/ Down Stream). · SOP
creation and enforcement, master protocol execution and deviation reports
creation. · Developed
and implemented technology project improvements to support operations at
large-scale bioreactors. Process Supervisor 1995 -
1997 MedSol Laboratories (Solid Drug
Industry) Havana, Cuba · To oversee
the operation in powder blending/granulation and coating in the manufacturing
of tablets. · To control
the quality of the products, operation planning and staff scheduling. EDUCATION___________________________________________________________ 4th Class Power Engineer. CML Course, NAIT 2013 Special Boiler Operator Certificate. ABSA2008 French course. UQAM, Montreal, Canada 2006 – 2007 MSc. Biotechnological Processes. (GPA-3.71) Havana University. Havana, Cuba 2000 – 2002 B Eng. Process Engineer (GPA-3.56) Technical University. Havana, Cuba 1990 –
1995 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
French |
Intermediate |
|
|
Spanish |
Fluent |
|
|
|